NEWS
Integrated ROV opetration
19/08/2014
Stinger has recently conducted an integrated ROV operation beneath an oil platform in the North Sea. Real-time video was distributed, on a daily
Read MoreReal-time anchor chain monitoring
19/08/2014
Stinger has developed a real-time anchor chain monitoring system for floating facilities, such as an FPSO vessel. This allows the presence and exact
Read MoreIntegrated ROV operation between Stavanger and the North Sea
19/08/2014
Stinger offers safe and cost-efficient subsea monitoring and inspection services with the aid of dedicated innovative methods which are both small
Read MoreSubsea leak detection beneath an oil platform
19/08/2014
A permanent subsea leak detection system has been developed and installed on the seabed beneath an oil platform in the North Sea. Data are recorded
Read MoreSafe and cost efficient ROV drill support
19/08/2014
During a conductor batch campaign, Stinger recently conducted an ROV-based drilling support and spudcan inspection operation for a jackup rig. This
Read MoreMetrology inside petroleum storage facilities
19/08/2014
When planning a new train tunnel, it became vital for Stinger’s client to document the exact shape and geographical position of petroleum storage
Read MorePermanent submerged ROV
20/05/2014
It is only one way to find out if your ROV can stay submerged for half a year – just do it! …., and now we are aiming for a ...
Read MoreSubsea Mars Rover, a moon landing on the seabed
21/06/2013
Stinger Technology is holding a presentation at the ONS Norway conference 19-21 August covering the challenges and possibilities when flying an ROV
Read MoreSubsea Leak Detection
16/01/2013
The first full-scale subsea leak detection system in the North Sea has been successfully installed, tested and started-up by Stinger Technology and
Read More